by Eric Wilbert | Jun 23, 2015 | Uncategorized
By Melanie Wilbert “Greg started with a job description of ‘Whatever needs to be done is what you have to do’. After a few years, his mechanical ability and his attention to detail led him to new responsibilities. These responsibilities included repairing flood...
by Eric Wilbert | Jun 18, 2015 | Uncategorized
It may not look like much today but this is the future site of the Dismantling building at Wilbert’s Lakeside. The ground is currently being leveled and cleared to stake out a 13,930 square foot building. The new building will contain Six 30’ x 18’ bays to allow six...
by Eric Wilbert | Jun 17, 2015 | Uncategorized
The gas punch building modernizes the way Wilbert’s Lakeside recycles the fuel left in the tanks of salvage vehicles. Punching holes will eliminate potential hazard and ease the work of our Employees. The shell of the gas punch building is now complete. Now onto the...
Recent Comments